Rick's Charger Recent updates 04/29/20
test fit left side roof panel. Grille install. Hood work and install. Electrical work on power windows.
05/03/20 - finished headlight motor circuit wiring & testing
05/10/20 - resolve power window operation issues
06/01/20 - Install trunk stripe, Install left roof section support, Test dash display unit, Hood work
06/20/20 - 66 Charger project Hood scoop and edge repairs before wrap is installed
08/10/20 _finished the hood & installed
08/17/20 - started mockup of new Terminator X engine management system
08/23/20 - Install Terminator X ECU, Wet sand roof panels for wrap
08/29/20 - installed Front Camera in the grill & working on the 29 Truck
09/01/20 - Mockup the new Booster and Master Cylinder Assembly
09/04/20 - Install wrap on right upper quarter panel & roof fitment
10/15/20 - Car Moved to Lift, Rear End removed, Bottom reconditioned & prepped for assembly.
10/30/20 - Installed Fuel tank, Install fuel lines, Install brake lines, Fabricate & Install A/C hoses under car, Install rear end, Install auxilary fuel pump, Install sway bar, Install transmission linkage, Fabricate & install exhaust system, Install brake booster linkage, Bleed brakes, add oil & trans fluid, check for leaks. MOVE CAR TO DETAIL SHOP.
11/01/20 1rst Engine cranking. Engine fires then quits.
11/04/20 Troubleshoot engine starting. Add relay to fuel sump and replace crank & cam sensors.
11/11/20 Download new tune & start engine.
11/14/20 Drive car to mechanical shop & repair brake line leak.
11/20/20 Finish amp & Audio installation
11/26/20 Prove that you can move music with frequency response
11/27/20 Begin the sky console fabrication
01/10/20 Finish wrap installation
01/30/21 Windshield prep & install
02/10/21 Begin gauge restoration process